Pratt & Whitney Gas Turbine 66.9 MW Pratt & Whitney Dual Fuel Turbine Power Plant Model FT8-1 twin gas turbines, steam turbine and boiler, 3000 rpm, 10.5KV, 50HZ, Installed in 1996, overhauled in 2005/2006, upgraded to dual fuel in 2007. Both units have under 1400 hrs since overhaul. This plant is in very good condition and maintained by manufacturer. Complete combined-cycle power plant.
Sulzer Diesel Generator Set 10.5 MW Sulzer HFO Generator set, rebuilt 0 hrs. Engine Model: 16ZAV40S, Alternator: Alstrom, 500 rpm, 50HZ, Year: 1993, ¡§0¡¨ hrs since engine has been overhauled by the manufacturer with OEM parts, 6 months warranty, Dismantled and ready for shipment.
Mitsubishi Diesel Generator Sets Three (3) 1700 KVA Mitsubishi Diesel Generator Sets Type: S16RPTA, 1700 KVA, 50 HZ, 415 Volt, 1500 rpm, Hours of operation 20 hrs to 249 hrs. Each set is in Acoustic Enclosures with Control panels, pumps, Day Fuel Tank and accessories. Contact us for further information
Caterpillar 3612 Diesel Generator Sets Three (3) 3750 KVA, 3612 Rebuildable Diesel Generator Sets 3750 KVA, 1000 rpm, 6600 volt, 50 HZ, 3 phase, .8 PF, Year: 1988 Three running take out Caterpillar 3612 engines with generators. All three sets have standard blocks and cranks. Excellent value for a small budget.
Caterpillar 3616 Gas Generator Set 4500 KVA Caterpillar 3616 Gas Generator Set Engine: 3616 SITA, Output: 4500 KVA, 1000 rpm, 5500 volts, 50HZ, Generator: SR4, Year 1996, Hours 42,000 The complete set was maintained by Caterpillar its entire life under the caterpillar scheduled maintenance program. All manuals and maintenance records of work performed by the manufacture are on site and can be viewed during inspection. Contact us for details
Coal Fired Power Plants Two (2) 135 MW Coal Fired Power Plants Two Twin cylinder steam turbines, Year: 2003 to 2005 137 MW, 13800 volt, 50Hz, Boiler: 420ton/hr, 13.7MPa, output temp 540deg C, inlet temp: 247.93deg C, eff: 91.79% Complete plant with coal and ash handling system, water system, chemical system, electrical and control system. Total 270 MW Contact us for more information
GE 7EA Gas Turbines Four (4) NEW 7EA Gas Turbines Packages Output: 81 MW, 13.8 KV, 60 HZ, Duel Fuel: Crude Oil or Distillate Oil. Contact for more information.